We reached the sea floor!
The drilling process is controlled from the rig floor. The pipes are stored in a large rack, located aft of…
The drilling process is controlled from the rig floor. The pipes are stored in a large rack, located aft of…
After 3 days of transit, we arrived on our first site of coring last night! To drill successfully, the ship…
No land for 8 weeks!