On our first site: JB-3
Finally we arrived at our first site. We will be drilling at 3446m depth and there are lots of pipes going down right now. The first core is expected to be on deck at 3 am and we cannot wait to start our studies.
Finally we arrived at our first site. We will be drilling at 3446m depth and there are lots of pipes going down right now. The first core is expected to be on deck at 3 am and we cannot wait to start our studies.