Arriving on Station
ARRIVING ON STATION We arrived over the first drill site close to the end of day shift on March 14. …
ARRIVING ON STATION We arrived over the first drill site close to the end of day shift on March 14. …
ARRIVING ON STATION We arrived over the first drill site close to the end of day shift on March 14. …
PRESENT ACTIVITY: Update as of 0900 hr 17 March 2009. XCB coring from 147.6 mbsf to 157.3 mbsf. This hole…
PRESENT ACTIVITY: Update as of 0900 hr 17 March 2009. XCB coring from 147.6 mbsf to 157.3 mbsf. This hole…
PRESENT ACTIVITY: Update as of 1000 hr 16 March 2009 After recovering the XCB core barrel, we pumped down a…
LOCATION: Site U1331: Hole U1331A (PEAT-1C) Preliminary Position: 12°04.089’ N, 142°09.698’ W. Preliminary Water Depth: 5143 meters below rig floor…
LOCATION: Site U1331: Hole U1331A (PEAT-1C) Preliminary Position: 12°04.089’ N, 142°09.698’ W. Preliminary Water Depth: 5143 meters below rig floor…
PRESENT ACTIVITY: Update as of 0800 hrs 14 March 2009: Underway for PEAT-1C at 10.5 knots. The vessel is pitching…