Exp359. 19th Oct. The JOIDES Resolution is on the 1st drilling site: suite !!
The coring parade began in the early afternoon at the rhythm of the “Core on deck”. The rhythm is given…
The coring parade began in the early afternoon at the rhythm of the “Core on deck”. The rhythm is given…
Arrival on site U1471 (MAL-07) at 15:45 yesterday. Once the thrusters have come down to stabilize the boat, The positioning beacon was…
Yesterday the drilling well U1466B provided its carrots quietly to the rhythm of a new drilling every 30 to 50mn….
Beaucoup de travail cependant sur le rig floor (https://www.facebook.com/joidesresolution
Training and presentations continue on board. Everyone takes the measure of what awaits him when one is on the 1st site…
Arrived at 4:18 am, the thrusters and hydrophones were lowered and the JOIDES was put in dynamic positioning, (ie it is able to…
A lot of work however on the rig floor ( https://www.facebook.com/joidesresolution < ). Today it was decided to stop drilling the time…